Home / About us
Behind every transformer is a team that cares.
Since 1975 we have made the equipment you never think about, until the lights have to stay on. That is exactly why we sweat the details.



When the lights stay on, nobody notices. That is how we know we have done our job.
Pragati began in 1975 as a private limited company with one aim: to make reliable solutions for electrical power distribution. We grew into medium, low and high voltage, and into testing, because our customers kept asking for more and we did not want to let them down.
Behind every drawing, every winding and every test report is a person who knows that a family, a factory or a hospital depends on what we make. We take that personally.
What guides us
Vision
To lead in energy-efficient electrical equipment by delivering quality at a fair price, growing responsibly and protecting the people who do the work.
Mission
To help customers maintain a reliable power supply and reduce electrical losses through the equipment we design and manufacture.
Values
We believe in affordable, sustainable power, responsible production and resource use, and doing business reliably and ethically.
Quality policy
We aim to earn customer satisfaction through dependable quality, competitive pricing and continuous improvement, with sustainability in mind.
Fifty years, one step at a time.
From electrical distribution to high-voltage manufacturing and testing. Scroll to follow the line.
- Chapter one · Foundations
1975
Pragati is founded
Incorporated as a private limited company with a view to make reliable solutions for the electrical power distribution segment.
1996
Expansion into medium and low voltage
A new unit started in Navi Mumbai to serve the medium-voltage switchgear industry, and a separate facility was created for low-voltage solutions.
2003
ISO certification for synthetic HV bushings
The company received ISO 9000 certification in synthetic HV bushings.
- Chapter two · High-voltage expansion
2008
Entering high-voltage manufacturing
With an eye on the power transmission segment, high-voltage solutions became a new manufacturing business segment.
2009
First manufacturing facility in Murbad
The first Murbad facility expanded the high-voltage business, with solutions up to 145 kV type tested.
2018
Growing medium-voltage capacity
A new facility at Murbad to serve increased volumes in medium voltage.
- Chapter three · New applications and testing
2019
Instrument transformers for medium-voltage GIS
Became one of the few global manufacturers of instrument transformers for medium-voltage gas insulated switchgear (GIS).
2022
Instrument transformers for rail traction
Became one of the few global manufacturers of instrument transformers for railway locomotive and traction applications.
2023
A 765 kV lab and new clean rooms
An ISO 6 clean room for capacitor element winding, clean rooms for insulation building, and a 765 kV test laboratory for type tests and R&D.
2024
High-voltage impulse testing
A high-voltage impulse test set-up added to strengthen testing capability for transients.
2025
A factory for epoxy switchgear components
A new factory set up to manufacture switchgear epoxy components.
2026
Expanding into EHV GIS and surge arresters
Manufacturing of MV surge arresters, a facility for instrument transformers used in EHV GIS, and capacity expansion for 245 and 420 kV instrument transformers.
Looking ahead
What is next
Launching oil impregnated paper, resin impregnated paper and resin impregnated synthetic bushings.
Explore our solutions
Where that journey has taken us.
51Years of experience
10+Manufacturing units
2,500+Satisfied clients
30+Countries served
Come and say hello.
We would love to hear what you are building, and how we can help it run reliably.